Category:1991 - new exhibits and infrastructure
From The Brighton Toy and Model Index
Jump to navigationJump to search
1990 | Events | 1992 |
1990 | Exhibits and upgrades | 1992 |
1991: The original exterior of the site [image info]
1991: Interior work underway [image info]
At the very beginning of 1991, we'd acquired the site under the station forecourt, and began the backbreaking work of stripping, cleaning and rebuilding the interior for an opening scheduled in mid-1991.
Media in category ‘1991 - new exhibits and infrastructure’
The following 12 files are in this category, out of 12 total.
- Construction of Brighton Toy and Model Museum, interior 01 (1991).jpg 1,496 × 1,574; 195 KB
- Construction of Brighton Toy and Model Museum, interior 02 (1991).jpg 1,572 × 1,572; 225 KB
- Construction of Brighton Toy and Model Museum, interior 03 (1991).jpg 1,179 × 787; 102 KB
- Construction of Brighton Toy and Model Museum, interior 04 (1991).jpg 784 × 1,177; 114 KB
- Construction of Brighton Toy and Model Museum, interior 05 (1991).jpg 1,182 × 786; 101 KB
- Construction of Brighton Toy and Model Museum, interior 06 (1991).jpg 1,082 × 782; 95 KB
- Construction of Brighton Toy and Model Museum, interior 08 (1991).jpg 1,565 × 1,566; 201 KB
- Construction of Brighton Toy and Model Museum, interior 09 (1991).jpg 1,582 × 1,582; 220 KB
- Construction of Brighton Toy and Model Museum, interior 10 (1991).jpg 1,579 × 1,593; 274 KB
- Construction of Brighton Toy and Model Museum, interior 11 (1991).jpg 1,582 × 1,588; 209 KB